
New Build Architect
A new house for your family, starting with the plot
Building a new home is the one project where you choose everything. You decide where the kitchen catches the morning sun and which room gets the view. It also means more decisions and permissions than any extension needs.
We design new build houses for homeowners, self-builders, landowners and developers. Our architect and architectural designers take a house from the first look at the plot to drawings a builder can price.
What our clients say
“Hayden and the team have been outstanding. From design to final implementation, nothing short of professional. Delighted!”
“Harrison was incredibly friendly, knowledgeable and proactive from start to finish. I highly recommend HAC Design for their professional and problem-solving approach.”
“Planning permission was obtained quickly and multiple third parties told us our drawings were brilliant. Can't recommend your services enough.”
Recent projects
View all projectsThe plot comes first
The land decides what you can build before the design does, so the site constraints come first.
Some are physical, such as the slope, the access from the road and the neighbours' windows. Others are planning designations.
Green Belt is the best known. It's land around towns and cities where new building is tightly restricted. National policy can still allow a replacement house, as long as it's not noticeably bigger than the one it replaces. It can also allow limited infilling in a village, which means building in a gap between existing houses.
A conservation area matters too. That's a place the council has designated for its architectural or historic interest. The design of a new house there gets close attention. So does one beside a listed building, which is a building with legal protection for its history or architecture.
Some councils add requirements of their own, so the local rules for the plot need checking as well.
Not every plot is bare land. The plot at Cromwell Road in Henley-on-Thames already held a bungalow. We replaced it with a larger family home in a Neo-Georgian style, with an open-plan kitchen and living area. There are more designs on our projects page.
Designing the house
Once we know what the plot allows, the architectural design turns to how you want to live. That means the rooms you need, how they connect and how you arrive.
We draw the layouts and can model the house in 3D, so you can walk through it before it exists.
Book a free 30-minute consultation
New build planning permission
A new house almost always needs planning permission. Permitted development, the national right to make small changes to a house without applying, doesn't normally cover building one.
There are two main routes. A full planning application shows the whole design. An outline application first settles whether a house can be built there and leaves the details for a later approval.
Whichever route suits the plot, we can prepare and submit the application and answer the planning officer handling it. The council's decision typically takes eight to thirteen weeks.
Two more requirements are worth knowing about early in a new build project. The first is the Community Infrastructure Levy, a charge some councils make on new homes. People building a home to live in can claim an exemption, which has to be granted before work starts.
The second is biodiversity net gain, which means leaving nature measurably better off than before. Sites of 0.2 hectares or less, about half an acre, are generally exempt.
Building regulations and construction drawings
A new house needs building regulations approval. The regulations set the legal standards for structure, fire safety, insulation and drainage. They also set how energy efficient the house has to be.
We produce the construction drawings, design methodology and specifications and submit them to Building Control. The foundations and the structure above them are designed by HAC Structure, whose work is quoted on its own. Building Control inspectors then visit as the house goes up, to check the work against the regulations.
Book a free 30-minute consultation
VAT on a new build
VAT on a new house doesn't work the way it does on an extension. Work on a new, self-contained house can be zero-rated, which means the builder charges VAT at 0%. People building their own home can also reclaim the VAT on materials.
The conditions are strict. The government's guide to reclaiming VAT on a self-build home sets out the refund scheme. The zero-rating rules are in its VAT guide for builders. Take an accountant's advice before you rely on either.
Self-build
If you're managing the build yourself, you may not want a full service. We can provide the complete design, or help with one stage, such as the planning application or the building regulations drawings. Our self-build page has more.
If you haven't found land yet, it's worth joining your council's register of people looking for a self-build plot.


